There are two Over Height Valves per bogie, 32 valves per vehicle and a requirement of 1,504 valves fitted to the fleet in total. This requirement is to provide the material only and the overhaul will be carried out by Depot Engineering.
You must be logged in to view the rest of this content, click here to login
Don't have an account, click to sign up for our 14-day free trial.