The works consists of up to 3 applications (per annum) of approved herbicide to all of the
adopted highway footpaths (circa 1280km consisting of tarmac, slabs, block paving, etc.),
back of path edges, walkways, splitter islands, channels, ginnels, edges of all metalled roads
and all cobbled areas throughout the borough of Rochdale to provide as near to as possible
total weed control.
The overall aim is to achieve as close as possible 100% total…
You must be logged in to view the rest of this content, click here to login
Don't have an account, click to sign up for our 14-day free trial.