Tender Details

CBRM Power Distribution Switchboard Replacement – 2022

This project aims to replace the existing LV switchboard housed within the CBRM substation plant room and replace the existing power generator with a higher-rated size to make the building is fully essential in keeping with the site standards.

You must be logged in to view the rest of this content, click here to login

Don't have an account, click to sign up for our 14-day free trial.