Construction of a new block-built mobility scooter storage unit with roller shutter door and associated works to include car park alterations, re-surfacing, line painting, surface water drainage connection and mains electrical connection.
You must be logged in to view the rest of this content, click here to login
Don't have an account, click to sign up for our 14-day free trial.