Installation of approximately 3,900 hardwood Dragon’s Teeth posts across multiple mapped locations. Works are divided into two lots: Lot 1: North of the A31 – approx. 1,217 posts Lot 2: South of the A31 – approx. 2,684posts Removal and safe disposal of existing posts where applicable.
You must be logged in to view the rest of this content, click here to login
Don't have an account, click to sign up for our 14-day free trial.