The Supply of an ADS equipment package to be supplied into the Hydrogen-3 Advanced Technology Facility at UKAEA’s Culham Campus. The scope of work is expected to be delivered, installed, and commissioned within an estimated duration of 36 months.
Sub-system Package – the package scope of work includes design, manufacture, assembly, Factory Acceptance Testing, delivery, supply, installation, Site Acceptance Testing and commissioning.
You must be logged in to view the rest of this content, click here to login
Don't have an account, click to sign up for our 14-day free trial.