Tender Details

Laboratory Medicine Building Queen Elizabeth University Hospital Campus Obsolete BEMS Replacement – Phase 2

NHS GG&C require the Building Energy Management System (BEMS) at Laboratory Medicine Building Queen Elizabeth University Hospital Campus to be upgraded to meet the criteria detailed with the BRE Energy Management and Building Controls briefing paper. This means that a full ’turnkey’ project encompassing a fully designed, supplied, installed and commissioning of the project is
needing to be delivered. The project will upgrade the existing control installation including the design…

You must be logged in to view the rest of this content, click here to login

Don't have an account, click to sign up for our 14-day free trial.