Tender Details

Lead Work

Additional lead works to turret, including the necessary timber repair
Remove flaking paint from leadwork to the top two levels of the
28-square-metre turret
Triflex Pro Tect is installed on the
remaining lead work to the top two levels (35m²)
Install Triflex Pro Tect on the two remaining lead flat roofs
Ensure that stone repairs are carried out and that the crest is painted on the front of the building

You must be logged in to view the rest of this content, click here to login

Don't have an account, click to sign up for our 14-day free trial.