Tender Details

London Gateway Berth 5 Structured Cabling System

This document is issued as part of the Request for Information (RFI) / Pre-Qualification Questionnaire (PQQ) stage and seeks to obtain information from suitably qualified suppliers for the design, supply, installation, commissioning, and warranty provisions for the Structured Cabling System (SCS), including the following:
▪ OS2 fibre cabling.
▪ Copper Category 6A data cabling.
▪ Coordination of infrastructure services including CCTV cameras and Wi-Fi.
▪ Duct cover lifting, draining of flooded ducts and…

You must be logged in to view the rest of this content, click here to login

Don't have an account, click to sign up for our 14-day free trial.