Manchester Airport Pier 2 Phase 2 – TP6300 MEP Package

Pier 2 Phase 2 – TP6300 MEP
MAG shall appoint a suitably qualified and experienced MEP Contractor(s) to provide Design and Build services for the Pier 2 Phase 2 MEP Package at Manchester Airport.
The scope of these works includes:
but is not limited to design, supply, install, test and commissioning of mechanical, electrical, fire life safety, IT and ELV systems to achieve a BREEAM rating of very good and where possible using MMC and DFMA solutions of modularisation and prefabrication. Provide labour off site to supply and install, into the Fixed Links & Nodes (FLANs) kit of parts, are all required elements within this package.
The anticipated value of MEP works is estimated at 16m GBP, across a 24 month period across design, manufacture, install, test and commission with a physical 12 month install, test and commission period.
The Procurement Model is currently envisaged a Two Stage Design and Build upon RIBA Stage 3 with a Early Contractor Involvement agreement (ECI) running through RIBA Stage 4