Tender Details

NPL – Cross Site Time Fibre (CSTF)

NPL needs to link the two side of its Teddington site with high spec fibre optic cables. It is envisaged that horizontal directional drilling or micro tunnelling technologies will be employed, though NPL is open to other compliant proposals. To ensure future resilience 4 parallel ducts are required and due to the congested nature of the site a maximum of 4 access chambers/pits can be accommodated over the 800m…

You must be logged in to view the rest of this content, click here to login

Don't have an account, click to sign up for our 14-day free trial.