NRS Dounreay intend to award a Contract for the inspection, calculation and determination of the structural integrity of the PFR Turbine Hall and SGB structural steel frames to close out ONR Actions. The Contractor will provide a methodology for maintenance and repairs, if any, that are required to ensure both areas are suitable for continued use.
You must be logged in to view the rest of this content, click here to login
Don't have an account, click to sign up for our 14-day free trial.