Tender Details

Provision of High Level Scaffolding at Beauly Priory

As part of the High-Level Repointing and Wallhead Consolidation Project, Historic Environment Scotland has a requirement for high level scaffolding at Beauly Priory, Beauly, IV4 7DU. Scaffolding is required around gables and wallhead, internal and external as per design drawings to allow for masonry consolidation works on wallheads and should be Cuplock scaffolding to suit the design plans.

You must be logged in to view the rest of this content, click here to login

Don't have an account, click to sign up for our 14-day free trial.