The UAE Network requires a contractor to remove existing air-conditioning units and install new DX-type, wall-mounted, CE-marked non-inverter units at two sites: Abu Dhabi (14 units of 1.5 Ton and 20 units of 1 Ton) and Dubai – British Embassy Compound (21 units of 2 Ton and 9 units of 1.5 Ton). The scope includes installation with copper piping, conduits, drain lines, and mounting supports, followed by leak testing,…