Framework for the Provision of Tarmacadam Materials / Asphalt Materials. For the use of proactive and reactive maintenance of the highway network within the City of Stoke-on-Trent on a delivery and collection basis.
LOT 1 – Collection of Asphalt Material – North Area
LOT 2 – Collection of Asphalt Material – Central/South Area
LOT 3 – Delivery of Asphalt Material – Minimum of 16 tonne to maximum of 300 tonne loads
For full…
You must be logged in to view the rest of this content, click here to login
Don't have an account, click to sign up for our 14-day free trial.