The existing terminal building at Tiree as reached the end of its’ serviceable life and is to be replaced with a new, modern building along with additional works to increase the capacity of the marshalling area and improve the footways and road surfacing. The port will remain operational throughout the construction period.
You must be logged in to view the rest of this content, click here to login
Don't have an account, click to sign up for our 14-day free trial.